Needs a fuel filter and some shakedown time, but does fire roads pretty well for an MX hybrid. 100B frame modified, 97 engine with cushioned primary and 94 gear set. Seems I left out the control shaft o-ring. Anyone know for certain whether the control shaft can be pulled without splitting the cases?

Re: Project completed - finally

Posted: Fri Mar 20, 2015 7:59 pm
by Bullfrog
Heck yeah. Replacing ANY control shaft item (including the O-ring in the end of the counter shaft) can be done with engine in frame.

Lay bike on side. Tie kick start lever back. Remove clutch cover.

Remove control shaft snap ring and all control shaft components (springs, ball receiver) - don't drop any of those items into the engine.

Re-install clutch cover.

Stand bike up.

Remove shift cover. Pull Control shaft out. Replace O-ring. Re-install control shaft and shift cover.

Lay bike on side. Remove clutch cover. Re-install all the control shaft components (make dang sure the control shaft snap ring is properly installed and is fully "shrouded" by the snap ring retainer). Re-install clutch cover (use grease to hold clutch pressure piece in its bore).

Release kick start lever from its tied back position.

Stand bike up and go riding.

Ed

Re: Project completed - finally

Posted: Fri Mar 20, 2015 8:01 pm
by Bullfrog
PS: Are you SURE you left out the O-ring? (Like you found it on the bench?) A loose counter shaft sprocket nut will result in oil leakage and could easily make you think the O-ring is at fault.

Re: Project completed - finally

Posted: Sat Mar 21, 2015 1:26 am
by hodakamax
The bike looks great! I did have to stand on my head to view the top picture. Sounds like Ed has got you covered on the o-ring fix. Enjoy that new project!

Max

Re: Project completed - finally

Posted: Sat Mar 21, 2015 5:48 am
by Zyx
Thanks for the explanation on o-ring install. Very sure there is no ring in there, but I got this engine on eBay and there has been an endless list of things done wrong or left out completely. O-ring is just one of several. The clutch was missing discs, the transmission was from a 100B or MX, the wrist pin was pressed in instead of fitted. On and on. No doubt about where the oil is coming from.

Does everyone see one or more photos upside down. I think it is my iPad doing something screwy.

Re: Project completed - finally

Posted: Sat Mar 21, 2015 7:52 am
by viclioce
Had the same issue with the seals on the control shart. They were non-existent. Needed new print on control shaft and on the kickshaft. Had the tranny apart to replace all the seals anyway. The oil leaked around the control shaft while the bike was on the kickstand. I would loose about 10 ounces of oil until it dropped below the point where it would leak out around the control shaft seal.

Also it's recommended that you replace the circlip at the end of the shaft whenever you remove it. I also had a major pain trying to get it back on. Seems there's a special tool for pushing that clip back on over the end of the end of the control shaft. I sure couldn't get even the old one back on with the tools I had! ; D Victor

Re: Project completed - finally

Posted: Sat Mar 21, 2015 9:15 am
by Zyx
Special tool I have seen was made from a nut and bolt, with the nut inside diameter just large enough to pass over the rod, and the bolt inserted in the nut only part way, making a cavity the rod end will pass into, pushing the clip onto the rod. Its a pain in any event. Now I have to do all this without dropping the parts into the case. Odds, no better than 50/50.

Re: Project completed - finally

Posted: Sat Mar 21, 2015 10:19 am
by hodakamax
Hey Gang, here's the tool. Slide the collar down the taper pin over the clip and the whole thing is pushed on by the tool. Incredibly easy. I wonder if Paul has some of these for sale? If not AZ, you could probably manufacture one. By the way the large end of the taper pin is cupped which you can't see in the photo. The chances of getting that clip on without this tool are slim to none!

The pictures of the bike are right side up and looking good. (Except for that opaque vent hose)-- 8-)

Maxie

Re: Project completed - finally

Posted: Sat Mar 21, 2015 1:58 pm
by Zyx
I have a 4' lathe and a reciprocating mill, so probably could make one now that I know what they look like. Forgot to get less than opaque vent hose today. Next time. Reposted the photos from an iMac and they seem to be okay. When I looked using the desktop, one of the photos was upside down even to me. I think it is the iPad programming.

I managed to get the clip on the shaft a couple of weeks ago without tools other than pliers, sockets and such, but it did take a disproportionate amount of French.